TM 5-5420-202-20-3
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT (Sheet 5 of 5)
5.
Connect connector (N) at basket discon-
nect (page 10-296.69). If connector (P) was
removed, connect it also.
6.
7.
8.
9.
Connect connector (Q) at master control
panel. Using spanner wrench, tighten
spanner nut (R). If connector (S) was
removed, connect it.
Connect connector leads (T) and (U)
to manifold preheat switch on purge
pump handle.
Connect three ground straps at batteries
(page 10-268).
Perform functional check (TM 5-5420-
202-10).
End of Task
5-35
Change 7
10-296.33