TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 373 of 1060

TM 5-5420-202-20-3
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT (Sheet 5 of 5)
5.
Connect connector (N) at basket discon-
nect (page 10-296.69). If connector (P) was
removed, connect it also.
6.
7.
8.
9.
Connect connector (Q) at master control
panel. Using spanner wrench, tighten
spanner nut (R). If connector (S) was
removed, connect it.
Connect connector leads (T) and (U)
to manifold preheat switch on purge
pump handle.
Connect three ground straps at batteries
(page 10-268).
Perform functional check (TM 5-5420-
202-10).
End of Task
5-35
Change 7
10-296.33


Back to Top