TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 382 of 1060

TM 5-5420-202-20-3
BASKET/LIGHT SWITCH HARNESS REPLACEMENT (Sheet 4 of 9)
8.
Using 7/16 inch socket, remove screws (P) and lockwashers (Q) securing clamps (R)
at six locations.
9.
Using 7/16 inch socket, remove top screws (S), lockwashers (T), and washers (U) securing
clamps (V) at three locations.
Leave bottom screws installed.
10.
Using 7/16 inch socket, remove screw (W) and lockwashers (X) securing clamp (Y).
NOTE
This
illustration
shows
the
locations of straps and clamps
supporting the wiring harness.
Go on to Sheet 5
5-44
10-296.42
Change 7


Back to Top