TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 387 of 1060

TM 5-5420-202-20-3
BASKET/LIGHT SWITCH HARNESS REPLACEMENT (Sheet 9 of 9)
13.
Position master control panel (AH) in
bracket (AJ).
14.
Using 7/16 inch socket and 7/16
inch wrench, install four screws
(AK), new lockwashers (AL), and
nuts (AM) to secure panel (AH)
in bracket (AJ).
End of Task
15.
16.
17.
At basket disconnect, install and connect
connector (AN).
Install three ground straps at batteries
(page 10-268).
Perform functional check (TM 5-5420-
202-10).
5-49
Change 7
10-296.47
NOTE
Ensure connectors removed for
access are reconnected.


Back to Top