TM 5-5420-202-20-3
BRAKE LEFT HAND SLAVE CYLINDER AND TUBE ASSEMBLY REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
13-54
Cleaning and Inspection
13-56
Installation
13-56
TOOL S
: 9/16 in. socket with 1/2 in. drive
5 in. extension and ratchet with 1/2 in. drive
Putty knife
11/16 in. combination box and open end wrench
13/16 in. combination box and open end wrench
SUPPLIES:
Container
Gloves (Item 69, Appendix D)
1/2 in. plastic cap
Goggles (Item 70, Appendix D)
Lint-free cloth (Item 12, Appendix D)
1/2 in. plastic plug
1/2 in. masking tape (Item 57, Appendix D)
Dry cleaning solvent (Item 55, Appendix D)
Gaskets
REFERENCE:
TM 5-5420-202-10
PRELIMINARY PROCEDURE:
Remove powerplant (page 5-2)
REMOVAL:
NOTE
Clean all parts and general area prior to disassembly.
13-54