TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 982 of 1060

TM 5-5420-202-20-3
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 3 of 10)
Top Deck Replacement (Sheet 3 of 4)
8.
9.
10.
11.
12.
Using two other technicians, get
sling to lift top deck off
vehicle.
Place hoist hook through
middle eye of sling. Use
hoist with at least 4,000 lb
capacity to lift top deck.
Using hoist, position sling with
“T” toward front of vehicle.
Guide sling over top deck.
Connect four sling hooks to
four lifting handles of top deck.
WARNING
Be careful when lifting top deck. Serious
injury to personnel can result from care-
less handling.
13.
Lift top deck off vehicle. Put top
deck down in work area.
INSTALLATION:
1.
Using hoist with sling, lift top deck (A)
into position over powerplant. Sling
“T” should be toward front of vehicle.
2.
Lower top deck (A) into mounting position.
Go on to Sheet 4
16-23


Back to Top