TM 5-5420-202-20-3
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 8 of 10)
Top Deck Insulator Panel Replacement (Sheet 2 of 4)
4.
5.
Swing hoist about 1 foot in direction
of arrows, slowly lower end (D) of top
deck (E) until top deck is resting on
its top.
Remove two hoist chains from end
of top deck (E).
Go on to Sheet 3
TA249701
16-28