TM 5-5420-202-20-3
TOP DECK FRAME ASSEMBLY REPLACEMENT (Sheet 10 of 10)
Top Deck Insulator Panel Replacement (Sheet 4 of 4)
3.
4.
5.
6.
7.
Using drift pin to line up screw holes,
use 7/16 inch socket to install 19 screws
(H) and washers (J) holding supports
(K), spacers (L), retainer plate (M),
seal (N), and support (P).
Fasten two hoist chains to end (Q) of
top deck (D).
Using hoist, raise end (Q) of top deck
(D)until top deck is standing on end
(R).
Swing hoist about 1 foot in direction of
arrows, slowly lower end (Q) of top deck
(D) until top deck (D) is resting with insula-
tor panel facing down.
Remove two hoist chains from ends (Q),
of top deck (D).
Position seven straps (S) on frame with
holes alined.
Manually start seven screws (T) through
straps (S) into frame (U).
Using 7/16 inch socket,
tighten seven screws (T).
Install top deck door
panels (page 16-26).
Install top deck
(page 16-23).
End of Task
TA249703
16-30