TM-5-5420-202-20-4

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 4 OF 4

OCTOBER 1985

  TM-5-5420-202-20-4 - Page 290 of 534

TM 5-5420-202-20-4
SMOKE GRENADE CREW COMPARTMENT WIRING HARNESS ASSEMBLY REPLACEMENT
(Sheet 1 of 6)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
I
22-6
Installation
22-9
TOOLS: 7/16 in. socket with 3/8 in. drive
5 in. extension with 3/8 in. drive
Ratchet with 3/8 in. drive
Slip joint pliers, conduit style, with plastic jaw inserts
SUPPLIES:
Lockwashers (17 required)
REMOVAL:
Make sure there are no smoke
grenades in dischargers. Acciden-
tal firing of grenade could
hurt
or kill you.
1.
2.
3.
Set MASTER BATTERY switch (A)
to OFF.
Using socket, extension, and ratchet,
remove screw (B) and lockwasher (C)
securing clamp (D) and crew compartment
harness assembly (E) to pushbutton
unit (C).
Using pliers, disconnect electrical
connector (G) from pushbutton unit (F)
and electrical connector (H) from
power box (J).
Go on to Sheet 2
22-6


Back to Top