TM 5-5420-228-24
SEQUENCE VALVE (RV2) ADJUSTMENT (Sheet 1 of 1)
TOOLS:
3/16 in. socket head screw key
5/16 in. socket head screw key
9/16 in. open end wrench
SPECIAL TOOL: Gage, pressure (item 3, sec III, app B)
PERSONNEL:
Two
REFERENCE:
TM 5-5420-202-10
PRELIMINARY PROCEDURE:
Relieve hydraulic pressure (page 3-71)
QUADRANTS REMOVED FOR CLARITY
NOTE
If STE/lCE is available, go to STE/lCE Test 51
(page 2-47).
ADJUSTMENT:
1.
Using 5/16 inch screw key, remove plug (A).
Manually install pressure gage in opening
2.
left by removal of plug (A).
3.
Engage hydraulic pump (TM 5-5420-202-10).
4.
Set engine speed at 1800 rpm.
5.
Pull up on locking cylinder control
and ejection cylinder levers.
6.
Have second technician observe pressure gage
7.
8.
9.
10.
11.
12.
13.
14.
reading.
UNDER VALVE BANK
Return locking and ejection cylinder control levers to neutral position.
Remove adjusting screw cap (B) using wrench.
To adjust pressure, hold adjusting screw (C) with 3/16 inch screw key and use wrench
to loosen jamnut (D).
Using 3/1 6 inch screw key, turn adjusting screw (C) clockwise
to increase pressure or counterclockwise to decrease pressure.
Repeat steps 3 through 9 until pressure gage shows reading of 3200 ± 50 Ps
i
(22064±
340 kPa).
Holding adjusting screw (C) with 3/16 inch screw key, use wrench to tighten jamnut
(D).
Install adjusting screw cap (B) using wrench.
Remove pressure gage.
Using 5/16 inch screw key, install plug (A) and tighten.
End of Task
TA251477
3-79