TM-5-5420-228-24

LAUNCHER HYDRAULICS SYSTEM M48A5/M60A1 TANK CHASSIS, TRANSPORTING: FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT; MAINTENANCE MANUAL

AUGUST 1985

  TM-5-5420-228-24 - Page 650 of 750

VALVE BANK ASSEMBLY AND BRACKETS REPLACEMENT (Sheet 3 of 17)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Using 11/16 inch wrench, disconnect two
hose assemblies (A).
Using 11/16 inch wrench, disconnect
hose assembly (B).
Using 11/16 inch wrench, disconnect
hose assembly (C).
Using 15/ 16 inch wrench, disconnect
both ends of tube assembly (D) and
remove tube assembly (D) from the
vehicle.
Using 1-1/4 inch wrench, disconnect
hose assembly (E).
Using 1-1/4 inch wrench, disconnect
hose assembly (F).
Using 1-1/4 inch wrench, disconnect
hose assembly (G).
Using 1-1/4 inch wrench, disconnect
hose assembly (H).
Using 1-1/4 inch wrench, disconnect
hose assembly (J).
Using 1-1/4 inch wrench, disconnect
hose assembly (K).
TM 5-5420-228-24
Go on to Sheet 4
TA251704
4-55


Back to Top