TM-9-2320-209-20-3-1

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 1 OF 4

MAY 1981

  TM-9-2320-209-20-3-1 - Page 39 of 830

TM 9-2320 -209-20-3-1
CHAPTER 2
ENGINE SYSTEM GROUP MAINTENANCE
Section I. SCOPE
2-1.
EQUIPMENT ITEMS COVERED .
This chapter gives equipment maintenance pro-
cedures for the engine assembly and engine lubrication system for which there are
authorized corrective maintenance tasks at the organizational maintenance level.
2-2.
EQUIPMENT ITEMS NOT COVERED .
All equipment items for which corrective
maintenance is authorized at the organizational maintenance level are covered in this
chapter.
Section II.
ENGINE ASSEMBLY
2-3.
FRONT ENGINE MOUNTS REMOVAL AND REPLACEMENT.
NOTE
The following tasks are the same for the left and
right front engine mounts.
TOOLS : Hydraulic jack
15/16-inch socket wrench
3/4-inch open end wrench (2)
Lead or bronze hammer
Flat-tip screwdriver
SUPPLIES : Wood block (2)
PERSONNEL :
One
EQUIPMENT CONDITION :
Truck parked, engine off, handbrake set, wheels
chocked.
Preliminary Procedure. Open hood and both side panels. Refer to
TM 9-2320-209-10.
2-1


Back to Top