TM-9-2320-209-20-3-1

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 1 OF 4

MAY 1981

  TM-9-2320-209-20-3-1 - Page 707 of 830

TM 9-2320-209-20-3-1
CHAPTER 8
TRANSMISSION SYSTEM GROUP MAINTENANCE
Section I. SCOPE
8-1. EQUIPMENT ITEMS COVERED.
This chapter gives equipment maintenance
procedures for the transmission breather for which there are authorized corrective
maintenance tasks at the organizational maintenance level.
8-2. EQUIPMENT ITEMS NOT COVERED.
All equipment items for which corrective
maintenance is authorized at the organizational maintenance level are covered in this
chapter.
Section II.
TRANSMISSION
BREATHER
8-3. TRANSMISSION BREATHER REMOVAL AND REPLACEMENT.
TOOLS:
Cross-tip screwdriver (Phillips type)
7/16-inch wrench
SUPPLIES:
Solvent, dry cleaning, type II (SD-2), Fed. Spec P-D-680
Rag
PERSONNEL: One
EQUIPMENT CONDITION:
Truck parked, engine off, handbrake set.
a.
Preliminary Procedure. Remove intermediate tunnel, front transmission
gear shift lever, and boot. Refer to Part 3, para 18-5.
8-1


Back to Top