TM-9-2320-209-20-3-1

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 1 OF 4

MAY 1981

  TM-9-2320-209-20-3-1 - Page 712 of 830

TM 9-2320-209-20-3-1
c. Removal of Transmission Transfer Shift Lever and Linkage (Trucks M49A1C,
M49A2C, M50A1, M50A2, and M50A3).
FRAME 1
1.
Place power takeoff shift lever (1) in NEUTRAL position and lock by turning
shift lever lock (2) parallel with shift lever as shown.
2.
Using 3/4-inch wrenches, hold shoulder bolt (3) and unscrew locknut (4).
Take out bolt.
GO TO FRAME 2
9-2


Back to Top