TM-9-2320-209-20-3-1

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 1 OF 4

MAY 1981

  TM-9-2320-209-20-3-1 - Page 721 of 830

TM 9-2320-209-20-3-1
FRAME 4
1.
2.
3.
4.
5.
GO
Place rear tunnel (1) over transfer shifting lever (2) and aline tunnel mounting
holes with floor holes.
Set transfer shifting lever (2) down to LOW position to get 1/4-to-1/2-inch
clearance from top of rear tunnel. This distance is measured at point (A) as
shown.
Using ruler, measure distance from top of transfer shifting lever (2) to top of
crossbrace (3) as shown.
Take rear tunnel (1) out of cab.
Using ruler, set transfer shifting lever (2) to same distance from crossbrace
(3) as it was in step 3.
TO FRAME 5
9-11


Back to Top