TM 9-2320-209-20-3-1
CHAPTER 9
TRANSMISSION TRANSFER SYSTEM GROUP MAINTENANCE
Section I. SCOPE
9-1. EQUIPMENT ITEMS COVERED.
This chapter gives equipment maintenance pro-
cedures for the transmission transfer control and linkage assembly for which there
are authorized corrective maintenance tasks at the organizational maintenance level.
9-2. EQUIPMENT ITEMS NOT COVERED.
All equipment items for which corrective
maintenance is authorized at the organizational maintenance level are covered in this
chapter.
Section II.
TRANSMISSION TRANSFER CONTROL AND LINKAGE ASSEMBLY
9-3. TRANSMISSION TRANSFER CONTROLS AND LINKAGE WITH POWER TAKEOFF
REMOVAL AND REPLACEMENT (TRUCKS M49A1C, M49A2C, M50A1, M50A2,
M50A3, M756A2, and M764).
NOTE
Procedures given are the same for both air actu-
ated positive lockup transmission transfer with
power takeoff, and non air actuated positive
lockup transmission transfer with power takeoff,
except where noted.
TOOLS:
3/4-inch socket wrench Vise grip pliers
3/4-inch open end wrench
Small hammer
18-inch ruler 13/16-inch open end wrench
Needle nose pliers 5/8-inch wrench
Drift punch
SUPPLIES:
None
PERSONNEL: T
WO
EQUIPMENT CONDITION:
Truck parked, engine off, handbrake set.
a.
Preliminary Procedure. Remove intermediate and rear tunnels. Refer to
Part 3, para 18-5.
b.
Removal of Transmission Shift Lever and Linkage (Trucks M756A2 and M764).
Refer to para 9-4.
9-1