TM-9-2320-209-20-3-3

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 3 OF 4

MAY 1981

  TM-9-2320-209-20-3-3 - Page 249 of 548

TM
9-2320-209-20-3-3
FRAME 2
1.
2.
3.
GO
NOTE
If meter has plugs in pipe connections, take them out
before putting meter on shelf.
Carefully work meter (1) on shelf (2) and dine screw holes.
Put four screws (3) through holes in meter (1) and shelf (2) and hold with
wrench.
Using wrench, screw on and tighten four nuts with lockwashers (4).
Take tape (5) off opening in meter (1).
TO FRAME 3
18-234


Back to Top