TM 9-2320-209-34-2-1
FRAME 5
1.
Using bearing preload tester, pn 7950157, (1), wrap cable (2) around through
shaft (3).
2.
Pull on tester (1) until shaft turns. If original bearings are used, reading
should be 4 to 8 pound-inches. If new bearings are used, reading should be
12 to 18 pound-inches.
3.
Take off tester (1).
IF READING IS NOT WITHIN LIMITS GIVEN, GO TO FRAME 6.
IF READING IS WITHIN LIMITS GIVEN, TAKE OUT THROUGH SHAFT (3) (REFER
TO PARA 1O-7c, FRAME 10), THEN GO TO FRAME 7
10-73