TM-9-2320-209-34-2-2

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; MAINTENANCE; DIRECT SUPPORT AND GENERAL SUPPORT LEVEL; VOLUME 2 OF 2; PART 2 OF 3

MAY 1981

  TM-9-2320-209-34-2-2 - Page 498 of 899

TM 9-2320-209-34-2-2
FRAME 3
1.
Put chains on boring assembly (1). Hook wrecker to chains.
Using hoist, put tension on chains.
2.
Take out four screws and lockwashers (2), two on each side
boring assembly (1).
Soldier A 3.
Using wrecker, lift boring assembly (1) off truck and put it
wood blocks .
of
on
Soldier B 4.
Guide boring assembly (1) onto wood blocks as soldier A lifts it.
END OF TASK
17-481


Back to Top