TM-9-2320-209-34-2-2

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; MAINTENANCE; DIRECT SUPPORT AND GENERAL SUPPORT LEVEL; VOLUME 2 OF 2; PART 2 OF 3

MAY 1981

  TM-9-2320-209-34-2-2 - Page 505 of 899

TM 9-2320-209-34-2-2
Soldiers
A and B
1.
Put chain hoist on rack bar (1) as shown.
Soldier A
Soldier B
Soldiers
A and B
WARNING
When
chain
removing rack bar (1), be sure it is balanced on
hoist or it may fall causing damage to equipment
or injury to personnel.
2.
3.
4.
GO TO FRAME
Balance rack bar (1) when soldier B feels it is out of boring
gear case (2).
Feed rack bar (1) out of boring gear case (2), until it disengages.
Refer to Operation of Earth Boring Machine and Polesetter Trucks,
TM 9-2320-209-10.
Pull out rack bar (1).
17-488


Back to Top