TM 9-2320-209-34-2-2
FRAME 3
1.
2.
Put propeller shaft (1) in position.
Put in four nuts (2) and screws (3) and tighten nuts to 80 to 100 pound-feet.
NOTE
Follow-on Maintenance Action Required:
1.
Replace outrigger pump drive shaft. Refer to
TM 9-2320-209-20.
2.
Replace auger rack bar. Refer to para 17-56.
3.
Replace derrick tube assembly. Refer to
para 17-56.
4.
Lubricate earth boring machine assembly. Refer
to LO 9-2320-209-12/1.
END OF TASK
17-484