TM-9-2320-260-20

TRUCK, 5-TON, 6X6, M809 SERIES (DIESEL)

TECHNICAL MANUAL; UNIT MAINTENANCE

APRIL 1995

  TM-9-2320-260-20 - Page 1094 of 1337

TM 9-2320-260-20
I
13-52. VAN LIFTGATE CONTROL VALVE REPLACEMENT (Contd)
4. Install nipple (22), flow control valve (23), and two connectors (14) on tees (10).
5. Install control valve (3) on main frame mount (4) with three new lockwashers (2), screws (1),
and nuts (9).
6. Connect hydraulic hoses (7) and (5) to tee (8) and adapter (6).
7. Connect hydraulic hoses (11) and (12) to two tees (10).
8. Connect hydraulic hoses (15) and (16) to two connectors (14).
9. Connect hydraulic hoses (13) and (17) to control valve (3).
FOLLOW-ON TASKS:
Fill hydraulic system (LO 9-2320-260-12).
• Install control linkage on control valve (para. 13-51).
Operate liftgate (TM 9-2320-260-10) and check for leaks.
13-121


Back to Top