TM-9-2320-260-20

TRUCK, 5-TON, 6X6, M809 SERIES (DIESEL)

TECHNICAL MANUAL; UNIT MAINTENANCE

APRIL 1995

  TM-9-2320-260-20 - Page 815 of 1337

TM 9-2320-260-20
11-30. CAB TUNNELS REPLACEMENT
THIS TASK COVERS:
a. Tunnel Removal
d. Toeboard Installation
b. Rear Tunnel Removal
e. Rear Tunnel Installation
c. Toeboard Removal
f. Tunnel Installation
INITIAL SETUP
APPLICABLE MODELS
REFERENCES (TM]
All
TM 9-2320-260-10
MATERIAIS/PARTS
Thirty-two screw-assembled lockwashers
Two locknuts
TM 9-2320-260-20P
EQUIPMENT CONDITION
Parking brake set (TM 9-2320-260-10).
Companion seat removed (para. 11-31).
1. Remove thirteen screw-assembled lockwashers (4) and tunnel (3) from rear tunnel (8), toeboard (1),
and cab floor (10). Discard screw-assembled lockwashers (4).
NOT E
Perform step 2 if vehicle is equipped with lever lock.
2. Remove two locknuts (9), screws (6), and lever lock (5) from tunnel (8). Discard locknuts (9).
1
b.
Rear Tunnel Removal
I
Remove ten screw-assembled lockwashers (7) and rear tunnel (8) from cab floor ( 10). Discard screw-
assembled lockwashers (7).
Remove nine screw-assembled lockwashers (2) and toeboard (1) from cab floor (10). Discard screw-
assembled lockwashers (2).
Install toeboard (1) on cab floor (10) with nine new screw-assembled lockwashers (2).
Install rear tunnel (8) on cab floor (10) with ten new screw-assembled lockwashers (7).
NOT E
Perform step 1 if vehicle is equipped with lever lock.
1. Install lever lock (5) on tunnel (8) with two screws (6) and new locknuts (9).
2. Install tunnel (3) on rear tunnel (8), toeboard (1), and cab floor ( 10) with thirteen new screw-
assembled lockwashers (4).
11-56


Back to Top