TM 9-2320-260-34-2
16-29 CRANE CAB (GONDOLA REPLACEMENT (M819) (Contd)
2.
3.
4.
5.
6.
●
WARNING
All personnel must stand clear during lifting operations, A
swinging or shifting load may cause injury or death to personnel.
Ensure lifting capacity is greater than weight (500 lb (227 kg)) of
cab. Failure
to
do so may result in injury
to
personnel or damage
to equipment.
Lift cab (1) from wooden supports and position cab (1) next to boom (2).
Aline holes in cab (1) with holes in boom (2).
Install two new lockwashers (6) and screws (7) on cab (1) and boom (2).
Install bracket (10) and four new lockwashers (8) and
screws
(9) on cab (1) and boom (2).
Install four screws (3) on cab (1) and boom (2) with four new lockwashers (4) and nuts (5).
FOLLOW-ON TASKS:
•
•
•
•
•
•
•
•
Install cab door and steps (TM 9-2320-260-20).
Ihstall operator’s seat cushion (TM 9-2320-260-20).
Install spare tire (TM 9-2320-260-10).
Connect hydraulic lines and hoses (in cab) (para. 15-10).
Install control valve bank (para. 16-36).
Install cab stationary window (TM 9-2320-260-20).
Install cab side window (TM 9-2320-260-20).
Install cab door sliding window (TM 9-2320-260-20).
Install fire extinguisher and bracket (TM 9-2320-260-20).
Install floodlight electrical harness (TM 9-2320-260-20).
Install floodlights (TM 9-2320-260-20).
16-175