FOLLOW-ON MAINTENANCE
1.
Install front axle shafts. (WP
0411)
2.
Install front axle. (WP
0404)
3.
Fill differential carrier to proper oil level. (Volume 5, WP
0820)
4.
Start engine and road test vehicle. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-3
0406
0406-5/6 blank