TM-9-2320-272-23-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 3 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-3 - Page 784 of 1469

FOLLOW-ON MAINTENANCE
1.
Install primary low air pressure switch. (Volume 2, WP
0342)
2.
Install toolbox and step. (Volume 4, WP
0586)
3.
Start engine and allow air pressure to build to normal operating range. Check for air leaks at primary air
reservoir. Road test vehicle. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-3
0440
0440-5/6 blank


Back to Top