FOLLOW-ON MAINTENANCE
1.
Install toolbox and step. (Volume 4, WP
0586)
2.
Start engine and allow air pressure to build to normal operating range. Check for air leaks at secondary air
reservoir. Road test vehicle. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-3
0441
0441-6