INSTALLATION
1.
Position wiring harness (Figure 2, Item 13) on load center (Figure 2, Item 9).
2.
Install three wiring harness cables (Figure 2, Item 12) on 30 amp circuit breaker (Figure 2, Item 10) with three
screws (Figure 2, Item 11).
3.
Install wiring harness cable (Figure 2, Item 20), ground cable (Figure 2, Item 5), and cable assembly
(Figure 2, Item 6) on load center (Figure 2, Item 9) with screw (Figure 2, Item 7), two washers
(Figure 2, Item 8), and nut (Figure 2, Item 19).
4.
Install clamp (Figure 2, Item 18) on wiring harnesses (Figure 2, Items 13 and 16) and plate (Figure 2, Item 4)
with screw (Figure 2, Item 17).
5.
Install cover (Figure 2, Item 14) on load center (Figure 2, Item 9) with six screws (Figure 2, Item 15).
6.
Connect plug (Figure 2, Item 2) to air conditioner (Figure 2, Item 3).
7.
Install 12 clamps (Figure 2, Item 22) on wiring harness (Figure 2, Item 23) and van ceiling
(Figure 2, Item 1) with 12 screws (Figure 2, Item 21).
TM 9-2320-272-23-4
0654
0654-4