TM-9-2320-272-24-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL; VOLUME 3 OF 4

JUNE 1998

  TM-9-2320-272-24-3 - Page 224 of 799

TM 9-2320-272-24-3
4-75. TRANSMISSION SHIFT CABLE MAINTENANCE (Contd)
NOTE
Perform step 6 for M929/A1/A2 and M934/A1/A2 model vehicles.
6.
Install shift cable (1) on transmission lock-in solenoid bracket (8) with clamp (2), two screws (10), and
new locknuts (9), ensuring clamp (2) seats in groove of shift cable (1).
7.
Install shift cable (1) on transmission lock-in solenoid bracket (8) with clamp (2), U-bolt (3), and two
new locknuts (9), ensuring clamp (2) seats in groove of shift cable (1).
8.
Install transmission selector lever (para. 4-73).
c. Adjustment
CAUTION
Ensure manual control linkage arm is in proper detent for each
transmission selector position. Failure to do so may cause damage
to transmission.
1.
Remove spring clip (6) and shift cable (1) from manual control linkage (7), if necessary.
2.
Place manual control linkage (7) and transmission selector lever in first gear position.
3.
Align hole of manual control linkage (7) with trunnion (5). If trunnion (5) does not align, loosen
jamnut (4), and turn trunnion (5) clockwise to shorten or counterclockwise to lengthen. Tighten
jamnut (4).
4.
Install shift cable (1) on manual control linkage (7) with spring clip (6).
FOLLOW-ON TASKS:
l
Install left splash shield (TM 9-2320-272-10).
l
Start engine (TM 9-2320-272-10) and road test vehicle.
4-488


Back to Top