TM 9-2320-272-24-3
4-226. DEEPWATER FORDING PRESSURIZATION VALVE REPLACEMENT (Contd)
FOLLOW-ON TASKS:
Connect air pressure hose to valve (M939A2) (para. 4-227).
Start engine (TM 9-2320-272-10) and allow air pressure to build up to normal
operating range. Check for air leaks. Road test vehicle.
4-1033