TM-9-2320-280-34

TRUCK, UTILITY: M998 SERIES

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

JANUARY 1996

  TM-9-2320-280-34 - Page 264 of 1258

TM 9-2320-280-34
3-26.
ENGINE PREPARATION (6.2 L AND 6.5 L) (Cont ’d)
NOTE
Perform step 53 for 6.2 L early production vehicles only.
53.
Install spacer (23), clamps (53), and harness clamp (22) on support bracket (27) with capscrew (21),
washer (25), and nut (24).
NOTE
Perform step 54 for vehicles with new support bracket configuration.
54.
Install power steering line clamps (30) and wiring harness clamp (29) on support bracket (28) with
washer (33), capscrew (34), washer (32), and locknut (31).
NOTE
Perform steps 55 through 60 for vehicles equipped with a 60 amp alternator.
55.
Install leads 2A (12) and 5A (13) to studs (16) with two washers (17), lockwashers (18), and
nuts (19).
56.
Install ground 3B (6) on alternator (20) with lockwasher (5), and capscrew (4).
57.
Connect lead 568A (15) to engine wiring harness (14).
58.
Seal terminal connections (16) using adhesive sealant.
59.
Install terminal cover (3) on alternator (20) with two lockwashers (2) and screws (1).
60.
Install spacer (10), washer (11), and wire retaining strap (9) on alternator (20) with two lock-
washers (8) and screws (7).
3-200


Back to Top