7 - 10.
TRANSMISSION PREPARATION
7-10. TRANSMISSION PREPARATION
This task covers:
a. Disassembly
b. Assembly
INITIAL SETUP:
Tools
Materials/Parts
General mechanic's tool kit:
Six locknuts (Appendix E, Item 58)
automotive (Appendix G, Item 1)
Anaerobic gasket sealer (Appendix B, Item 45)
Special Tools
Equipment Condition
Torque adapter, 9/16 in. (Appendix G, Item 106)
Transmission/transfer case assembly removed
(para. 7-6 or 7-8).
Maintenance Level
Direct support
a. Disassembly
1.
Disconnect transmission/transfer case cooler lines (3) from transmission (2).
2.
Remove capscrew (4) and transmission/transfer case vent line clamp (5) from transmission (2).
3.
Remove six locknuts (1) and transmission (2) from transfer case adapter (7). Discard locknuts (1).
4.
Clean old sealer from transfer case adapter (7).
b. Assembly
1.
Apply anaerobic gasket sealer to transmission mounting surface (6).
2.
Install transmission (2) on transfer case adapter (7) with six locknuts (1). Using torque adapter,
tighten locknuts to 26 lb-ft (35 N m).
3.
Install transmission/transfer case vent line clamp (5) to transmission (2) with capscrew (2). Tighten
capscrew (4) to 11 lb-ft (15 N m).
4.
Connect transmission/transfer case cooler lines (3) to transmission (2).
7-28