TM-9-2320-283-20-2

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 2 OF 3

DECEMBER 1983

  TM-9-2320-283-20-2 - Page 539 of 852

TM 9-2320-283-20-2
BRAKE SYSTEM.
3-156.
TASK SUMMARY (Continued).
LIST OF TASKS
TASK
TASK
TASK
TROUBLESHOOTING
NO.REF
REF NO.
(PARA)
12
Supply Reservoir Replacement
3-168
2-11
a.
Removal.
3-168a
b.
Installation.
3-168b
13
Primary Reservoir Replacement
3-169
2-11
a.
Removal.
3-169a
b.
Installation.
3-169b
14
Secondary Reservoir Replacement
3-170
2-11
a.
Removal.
3-170a
b.
Installation.
3-170b
15
Park Brake Valve Replacement
3-171
a.
Removal.
3-171a
b.
Cleaning and Inspection.
3-171b
c.
Installation.
3-171c
16
Park Brake Valve Repair
3-172
-
2-11
a.
Disassembly.
3-172a
b.
Cleaning and Inspection.
3-172b
c.
Reassembly.
3-172c
17
Trailer Hand Brake Valve Replacement
3-173
2-11
a.
Removal.
3-173a
b.
Inspection.
3-173b
c.
Installation.
3-173c
d.
Operational Check.
3-173d
e.
Adjustment.
3-173e
18
Brake Treadle Valve Replacement
3-174
2-11
a.
Removal.
3-174a
b.
Cleaning and Inspection.
3-174b
c.
Installation.
3-174c
19
Trailer Supply Valve Replacement
3-175
2-11
a.
Removal.
3-175a
b.
Cleaning and Inspection.
3-175b
c.
Installation.
3-175c
3-911


Back to Top