TM-9-2320-283-20-2

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 2 OF 3

DECEMBER 1983

  TM-9-2320-283-20-2 - Page 542 of 852

TM 9-2320-283-20-2
BRAKE SYSTEM.
3-156. TASK SUMMARY (Continued).
LIST OF TASKS
Task
Troubleshooting
Task
Ref
Ref No.
No.
Task
(Page)
(Page)
34
Supply Reservoir Drain Valve
Replacement
3-190
2-11
a.
Removal.
3-190a
b.
Cleaning and Inspection.
3-190b
c.
Installation.
3-190c
35
Supply Reservoir Single Check Valve
Replacement
3-191
2-11
a.
Removal.
3-191a
b.
Cleaning and Inspection.
3-191b
c.
Installation.
3-191c
36
Tractor Protection Valve Replacement
3-192
2-11
a.
Removal.
3-192a
b.
Cleaning and Inspection.
3-192b
c.
Installation.
3-192c
37
Brake Pedal Double Check Valve
Replacement
3-1932-11
a.
Removal.
3-193a
b.
Cleaning and Inspection.
3-193b
c.
Installation.
3-193c
38
Fifth Wheel Toggle Valve Replacement
3-194
2-11
a.
Removal.
3-194a
b.
Cleaning and Inspection.
3-194b
c.
Installation.
3-194c
39
Differential Toggle Valve Replacement
3-195
2-11
a.
Removal.
3-195a
b.
Cleaning and Inspection.
3-195b
c.
Installation.
3-195c
3-914


Back to Top