TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 1040 of 1320

TM 9-2320-304-14&P
5-276
Direct Support and General Support Maintenance (Cont)
5-43.
CONTAINER HANDLING UNIT (CHU) KIT INSTALLATION (CONT).
WARNING
Container lock could drop suddenly if
not supported. Failure to comply may
result in injury to personnel.
(50)
Support rear container
lock (23) and remove lock
pin (21) and pin (22) from rear
container lock (23).
(51)
Position and lock rear
container lock (23) in ready
mode position by pulling out,
rotating down, and inserting
pin (22) and lock pin (21).
(52)
Repeat steps (39) through (51)
for right side of truck.
c. Follow-on Maintenance.
(1)
Install fuel tank (TM 9-2320-279-20).
(2)
Install bumper stop bracket (Para 2-9).
(3)
Install rear composite lights (TM 9-2320-279-20).
(4)
Install engine side panel and close engine cover (TM 9-2320-279-20).
(5)
Lubricate CHU (Para 3-2).
(6)
Remove wheel chock (TM 9-2320-279-10).
END OF TASK
Change 3


Back to Top