TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 1033 of 1320

TM 9-2320-304-14&P
5-269
Direct Support and General Support Maintenance (Cont)
(4)
Remove quick release pin (3) and pin (4) from short strut (5) and long strut (2).
(5)
Using handle of arm assembly (6), rotate arm assembly out to separate short strut (5) and long
strut (2).
(6)
Position flip lock (7) up to hold arm assembly (6) out. Release arm assembly.
NOTE
Rotating pin end of long strut counterclockwise 1/2 turn will decrease width
measurement by approximately 1/16 in. (1.59 mm).
Rotating pin end of long strut clockwise 1/2 turn will increase width measurement
by approximately 1/16 in. (1.59 mm).
Adjust both RH and LH long struts equally to obtain the correct width
measurement.
(7)
Remove screw (8) and cushion clip (9) from long strut (2).
CAUTION
Do not unscrew pin end too far. Gap between long strut tube and pin end flange should not
exceed 1.00 in. (2.54 cm). Failure to have sufficient engagement of pin end into long strut
could result in damage to equipment.
(8)
Rotate pin end (10) as required for correct width measurement.
Change 3


Back to Top