TM 9-2320-304-14&P
5-268
Direct Support and General Support Maintenance (Cont)
5-43.
CONTAINER HANDLING UNIT (CHU) KIT INSTALLATION (CONT).
(222)
Install ISO corner lock (228) on stowage tray (44) and rotate lock handle (229) 90 degrees.
(223)
Tighten handnut (230), rotate tab (231) to lock handnut, and install lock pin (232) in
bracket (233).
(224)
Repeat steps (221) through (223) for left side.
Change 3