TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 714 of 1320

TM 9-2320-304-14&P
4-234.42
Organizational Maintenance Instructions (Cont)
4-53.7 CONTAINER HANDLING UNIT (CHU) STOWAGE TRAY REPLACEMENT (CONT).
c. Installation.
(1)
Attach suitable lifting device to stowage
tray (1).
(2)
While Soldier B controls lifting device,
Soldier A positions stowage tray (1) on
front CHU support crossmember (2).
(3)
Install four screws (3) and locknut (4) on
stowage tray (1) and front CHU support
crossmember (2). Tighten locknuts.
(4)
Remove lifting device from stowage
tray (1).
d. Follow-on Maintenance.
(1)
Install rail transport corner ISO locks (Para 2-10.11).
(2)
Install container guides (Para 2-10.1).
(3)
Remove wheel chocks (TM 9-2320-279-10).
END OF TASK
Change 1


Back to Top