TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 992 of 1320

TM 9-2320-304-14&P
5-232
Direct Support and General Support Maintenance (Cont)
5-43.
CONTAINER HANDLING UNIT (CHU) KIT INSTALLATION (CONT).
WARNING
Crossmember assembly weighs 530 lbs. (240 kg). Attach lifting device to prevent possible
injury to personnel
(22)
Attach lifting device to front crossmember assembly (38).
(23)
Soldier A and Soldier B position front crossmember assembly (38) on left front support
bracket (13) and right front support bracket (26).
(24)
Install front crossmember assembly (38) to front support brackets (13) and (26) with 18
screws (39) and locknuts (40).
(25)
Remove lifting device from front crossmember assembly (38).
(26)
Install cushion clip (41), screw (42), and locknut (43). Tighten locknut.
Change 1


Back to Top