TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 995 of 1320

TM 9-2320-304-14&P
5-235
Direct Support and General Support Maintenance (Cont)
(43)
Measure and mark seven new screw hole positions on right-side frame rail (2) and left-side
frame rail (4).
(44)
Drill two 0.813-in. (20.7 mm) holes (64) on each rail near existing holes (65) as shown.
(45)
Drill three 0.812-in. (20.6 mm) holes (66) near end of frame rails (2) and (4) as shown.
Change 1


Back to Top