TM-9-2320-328-13-P-1

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 1 OF 3

MARCH 2009

  TM-9-2320-328-13-P-1 - Page 1095 of 1318

TM 9-2320-328-13&P-1
0100-3
DRAFT
0100
HWT2734
Step 3.
Install lamp in pump operator’s panel TANK TO PUMP indicator (WP 0214).
Open
pump operator’s panel (WP 0207).
Check for continuity across pump operator’s panel
wire harness wire 3895 (black) from pump operator’s panel TANK TO PUMP indicator
to a known good ground.
If there is no continuity, repair wire 3895 in pump operator’s panel wire
harness if repairable (TM 9-2320-325-14&P), or replace pump operator’s
panel wire harness (WP 0303).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION


Back to Top