TM 9-2320-328-13&P-1
0072-37
DRAFT
0072
Change 1
..
HWT2669
..
Step 42.
With a test lead set, check for continuity across CAN Lo wire (green) from main wire
harness cab pressure governor control connector, terminal 34 to pump operator’s panel
pressure governor control connector, terminal 34.
..
If there is continuity, go to Step 47.
..
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION