TM 9-2320-328-13&P-1
0072-39
DRAFT
0072
Change 1
..
HWT2671
..
Step 44.
With a test lead set, check for continuity across CAN Lo wire (green) from CAN datalink
cable Y connector (that was disconnected from main wire harness), terminal B to pump
house wire harness pressure governor ECU J2 connector, terminal 68.
..
If there is continuity, go to Step 46.
..
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION