TM 9-2320-328-13&P-1
0072-48
DRAFT
0072
Change 1
..
HWT2680
..
Step 53.
With a test lead set, check for continuity across main wire harness CAN Shield wire
(bare) from cab pressure governor control connector, terminal 42 to main wire harness
datalink cable connector, terminal C.
..
a.
If there is continuity, repair pump operator’s panel datalink cable if
repairable (TM 9-2320-325-14&P), or replace pump operator’s panel
wire harness (WP 0303).
..
b.
If there is no continuity, repair main wire harness datalink cable if
repairable (TM 9-2320-325-14&P), or replace main wire
harness (WP 0292).
..
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION