TM-9-2320-328-13-P-2

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 2 OF 3

MARCH 2009

  TM-9-2320-328-13-P-2 - Page 1034 of 1390

TM 9-2320-328-13&P-2
0280-6
DRAFT
0280
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
11. Remove three locknuts (31), cushion clips (32), cab power distribution wire harness block (33), and three
screws (34) from cab instrument panel assembly (35).
Discard locknuts.
END OF TASK
INSTALLATION
NOTE
Route cab power distribution wire harness as noted prior to removal.
Install cable ties, split loom, and cushion clips as required.
1.
Install cab power distribution wire harness block (33), on cab instrument panel assembly (35) with three
screws (34), cushion clips (32), and locknuts (31).
HWT2818


Back to Top