TM 9-2320-328-13&P-2
0280-6
DRAFT
0280
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
11. Remove three locknuts (31), cushion clips (32), cab power distribution wire harness block (33), and three
screws (34) from cab instrument panel assembly (35).
Discard locknuts.
END OF TASK
INSTALLATION
NOTE
•
Route cab power distribution wire harness as noted prior to removal.
•
Install cable ties, split loom, and cushion clips as required.
1.
Install cab power distribution wire harness block (33), on cab instrument panel assembly (35) with three
screws (34), cushion clips (32), and locknuts (31).
HWT2818