TM-9-2320-328-13-P-2

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 2 OF 3

MARCH 2009

  TM-9-2320-328-13-P-2 - Page 1039 of 1390

TM 9-2320-328-13&P-2
0280-11/(12 blank)
DRAFT
0280
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
10. Install five wires 1640 (7) on cab ground terminal block (8) with lockwasher (6) and nut (5).
11. Install seven wires 1138 (3) on cab 24 VDC terminal block (4) with lockwasher (2) and nut (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install cab power distribution block relays (WP 0244)
2.
Install cab power distribution block diode (WP 0243)
3.
Install cab power distribution block circuit breakers (WP 0242)
4.
Install cab instrument panel assembly (WP 0204)
END OF TASK
END OF WORK PACKAGE
HWT2816


Back to Top