TM 9-2320-328-13&P-2
0288-5/(6 blank)
DRAFT
0288
Change 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
7.
Install J2 connector (3) and J1 connector (2) on pressure governor ECU (4) and tighten two screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Install pump house panels E and L (WP 0339)
END OF TASK
END OF WORK PACKAGE
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
HWT3407