TM 9-2320-328-13&P-2
0141-9/(10 blank)
DRAFT
0141
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
14. Lightly lubricate preformed packing (8) with clean oil, and install preformed packing (8) and hose 1682910 (7)
on tee (9).
15. Lightly lubricate preformed packing (5) with clean oil, and install preformed packing (5) and hose 1682906 (4)
on tee (6).
16. Lightly lubricate preformed packing (2) with clean oil, and install preformed packing (2) and hose 1682902 (1)
on elbow (3).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install hydraulic heat exchanger bottom shroud panel installed (WP 0135)
2.
Install hydraulic oil filter (WP 0140)
END OF TASK
END OF WORK PACKAGE
HWT1805