TM 9-2320-328-13&P-2
0179-2
DRAFT
0179
INSTALLATION
1.
Apply teflon tape to threads of two elbows (3) and (4).
NOTE
Install elbows in same position as noted prior to removal.
2.
Install two elbows (4) and (3) on valve (7).
3.
Install valve (7) on vehicle with two couplings (6) and (5) (WP 0313).
4.
Install two air lines (2) and (1) on elbows (4) and (3).
END OF TASK
FOLLOW-ON MAINTENANCE
Install pump house panel K (WP 0339)
END OF TASK
END OF WORK PACKAGE
HWT0081