13
9
13
M977 SHOWN
15
14
9
12
Figure 5.
13. Stop paying out cable (9).
14. Assistant routes cable (9) through cable guide (13), over sheave (14), between roller
(15), and side of cable guide (13).
15. Pay out winch cable (9) as assistant routes cable over first axle and 1 ft. (30 cm) past
front roller guide assembly (12).
TM 9-2320-341-10
0084
0084-5