Table 1.
PMCS - WEEKLY - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
other obstacles while
operating crane. Failure
to comply may result in
injury or death to
personnel.
•
Ensure area is clear of
personnel prior to moving
SWING lever. Boom
should be swung slowly
enough so crane operator
has complete control.
Failure to comply may
result in injury or death to
personnel.
WARNING
If electrical power fails during
crane operation, move switch
on remote control unit to
SHUTDOWN position. Fail-
ure to comply may result in
injury or death to personnel.
CAUTION
Crane must be above vehicle
sides for clearance.
NOTE
Operate control levers with
light, even pressure. Moving
lever slightly will cause slow
TM 9-2320-343-10
0145
0145-49